Day 12 – Tuesday 28 November
Today the boys continued to remove soil from the site down to the skip bin. They also dug the holes for the posts of the retaining wall.
The moved the digger down onto the driveway to load the gravel needed to backfill the gap between the new retaining wall and the crumbling timber wall.
The ‘chilli bin’ was changed out today. What an operation!
We also had a visit from a very noisy pheasant coucal.